Concrete Tool Test

1. 
If a tool is being used for placing fresh concrete when must it be cleaned?
  1. Before the concrete is poured
  2. Right after the concrete is poured
  3. Once the tool is finished being used
  4. Does not need to be cleaned
2. 
What tool is used to ensure the concrete adequately flows around rebar and all excess air is removed?
  1. Trowel
  2. Vibrator
  3. Tamper
  4. Screed board
3. 
What tool is used for the first step of concrete placement? It sets the initial height of freshly poured concrete.
  1. Tamper
  2. Bull float
  3. Screed
  4. Trowel
4. 
A screed board needs to be made out of magnesium or aluminum for it to work correctly.
  1. True
  2. False
5. 
Describe the function of a bull float



6. 
Why would a magnesium float be preferred over a wooden float?
  1. It is lighter
  2. It pulls more concrete
  3. It is less expensive
  4. All of the above
7. 
What tool is used to pre cut concrete while it is wet to create a weak point for potential cracking?
  1. Broom
  2. Polisher
  3. Jointer
  4. Groover
8. 
What tool is used to create a textured finish on a concrete slab?
  1. Texturizer
  2. Power float
  3. Broom
  4. Rake
9. 
Once concrete is poured it is impossible to change the final finish of it.
  1. True
  2. False
10. 
What are used to allow the concrete finisher to walk on concrete for final troweling work?
  1. Screed boards
  2. Kneeling boards
  3. Bull floats
  4. Knee floats