None Roofing
What must be done with concrete, slate, or clay roof tiles before they are installed?
  1. Nothing needs to be done, install at will
  2. Prime existing roof to withstand the additional weight
  3. Preload onto roof to allow any structural settling to occur
  4. Prime the shingles with water resistant coating
None Roofing
When installing flashing, shingles, under layment of any type of roofing or siding material you need to ensure there is a           postive           overlap on all materials so water drains away and does not get caught in a negative lap.
None Roofing
What type of flashing is added to the bottom side of a chimney?
  1. Apron flashing
  2. Cap flashing
  3. Step flashing
  4. Cricket flashing
None Roofing
What must be done when using wood shingles on a lower pitched roofs such a 3/12 or 4/12?
  1. Use heavier asphalt felt
  2. Use more nails
  3. Reduce exposure of shingle
  4. Do not use
None Roofing
What is the recommended spacing between roof shingles laid side by side each other in a single course?
  1. 1/8"-1/4"
  2. 1/4"-3/8"
  3. 3/8"-1/2"
  4. 1/2"-5/8"
None Exterior Installation Techniques and Terminology
The portion of the door that is made of rubber, metal or plastic that helps prevent moisture, or air into the building is called the weather             stripping            .
None Windows and Exterior Doors
The window sash is the portion of the window that is operable, and the part you can open or close. What is the stationary portion called?
  1. Window sill
  2. Sidelight
  3. Passthrough
  4. Window frame
None Windows and Exterior Doors
If the window frame is the portion of the window that stays in place. The window        sash        is the portion of the window that is operable.
None Exterior Installation Techniques and Terminology
Window flashing is generally required in an area that gets high levels of rain.
  1. True
  2. False
None Layout and Planning of Work
A waste factor is a set amount for every material and does not change.
  1. True
  2. False
None Layout and Planning of Work
When ordering materials such as concrete, lumber, flooring and many others. You calculate the total amount of material you need and you add a waste          factor          which makes up for the cut offs and wastage that is required for the project
None Windows and Exterior Doors
The window sash can open, slide, or adjust and is installed inside of the window         frame        .
None Windows and Exterior Doors
The top and bottom horizontal members of the window frame are called the         rails        .
None Cabinetry
Kitchen cabinetry generally consists of the lower cabinets, as well as the upper cabinets which are referred to as the wall          units.         
College Culinary Skills
The Potatoes Gratin include what kinds of cheese?           Gruyere           and            Parmesan           breadcrumbs.
Grade 10 Culinary Skills
When serving complex and strong flavoured food, it is advisable that the garnish is               .
  1. bland
  2. large
  3. small
  4. spicy
Grade 11 Culinary Skills
Identify the variety of potato with high starch content.
  1. Yukon gold
  2. russet
  3. new potatoes
  4. red skinned
Continuing Education Kitchen Safety and Sanitation
Which of the following has recently become another reason to practice good food safety principles?
  1. Discovery of new foodborne illness
  2. the fact the foodborne disease outbreaks have become illegal
  3. The increase in media attention and coverage
Grade 2 Creation and the Fall of Man
On what day did God create man? (Genesis 1:26)
  1. Third day
  2. Fourth day
  3. Second day
  4. Sixth day
None Wall Framing
Describe the role of the bottom plate in a wood framed wall.