Want to see correct answers?
Login or join for free!
  printable Worksheets
Looking for printable worksheets?
Check out our pre-made printable worksheets!
Share/Like This Page
Filter By Grade

Continuing Education Other Questions

You can create printable tests and worksheets from these Continuing Education Other questions! Select one or more questions using the checkboxes above each question. Then click the add selected questions to a test button before moving to another page.

Previous Page 1 of 36 Next
Continuing Education Kitchen Safety and Sanitation
Identify the minimum temperature for holding hot food.
  1. 135 degrees F
  2. 140 degrees F
  3. 145 degrees F
  4. 150 degrees F
Continuing Education Layout and Planning of Work
When constructing a building, representatives from the city or municipality are called to the job site at different intervals throughout the project. What is the name of these representatives?
  1. Governers
  2. Inspectors
  3. Architects
  4. Builders
Continuing Education Layout and Planning of Work
A building by law is generally created and enforced by the                      .
  1. local community
  2. federal government
  3. state government
  4. owner of the building
Continuing Education Layout and Planning of Work
Along with building codes, there are also codes which govern electrical, gas, mechanical and            plumbing           .
Continuing Education Layout and Planning of Work
Building codes are generally created and governed by which level of government?
  1. Federal
  2. State
  3. Municipal
  4. All of the above
Continuing Education Layout and Planning of Work
A set of rules that specifies the standards of which all buildings are constructed is called what?
  1. Building code
  2. Building rules
  3. Building guidelines
  4. Building laws
Continuing Education Layout and Planning of Work
To determine which size douglas fir 2x12 you need to support a certain load of a building, what do you refer too?
  1. Building by law
  2. Building code
  3. Zoning law
  4. Manufactures specifications
Continuing Education Layout and Planning of Work
If you wanted to determine what type and use of building your allowed to build on a piece of property what would you refer too?
  1. Zoning regulations
  2. Building by laws
  3. Building code
  4. Building regulations
Continuing Education Layout and Planning of Work
Before construction of a building can begin on a piece of property the builder must be granted a building          permit         .
Continuing Education Layout and Planning of Work
What would you refer too for the requirements of what your fence is allowed to look like in your neighborhood?
  1. Building by law
  2. Building code
  3. Zoning requirments
  4. Building plans
Continuing Education Surveying and Plot Plans
Plot plans can indicate the existing grades of the property as well as the new grades of the property.
  1. True
  2. False
Continuing Education Surveying and Plot Plans
When contour lines are spaced closely together it means that the slope of the land is                .
  1. rough
  2. steep
  3. gradual
  4. long
Continuing Education Surveying and Plot Plans
This term is used to identify the differences in elevations and physical features of a piece of land.
  1. Topography
  2. Georaphy
  3. Geology
  4. Layout
Continuing Education Surveying and Plot Plans
The distance you are allowed to construct a building from the property line is called what?
  1. Building line
  2. Property measure
  3. Property line
  4. Setback
Continuing Education Surveying and Plot Plans
A contour line identifies the ....
  1. size of the land
  2. slope and elevations of the land
  3. direction of the land
  4. direction of the water flow on the land
Continuing Education Surveying and Plot Plans
The water connection is one utility often shown on the plot plan. What else is generally shown?
  1. Gas
  2. Sewer
  3. Electrical
  4. All of the above
Continuing Education Surveying and Plot Plans
On a plot plan sometimes a circle is shown. These circles are identified with 4 different                 which make up 90 degrees of the full 360 degree circle
  1. sections
  2. portions
  3. quadrants
  4. quarters
Continuing Education Surveying and Plot Plans
What is identified on all plot plans?
  1. True directional north
  2. Neighbouring houses
  3. Main floor square footage
  4. Roof style
Continuing Education Surveying and Plot Plans
25.25 feet is written on a plan. What is the equivalent of that measurement in inches?
  1. 25' 1/4"
  2. 300 1/4"
  3. 304"
  4. 303"
Continuing Education Surveying and Plot Plans
What type of line on a plot plan identifies the border of the property?
  1. Border line
  2. Property line
  3. Bearing line
  4. Setback line
Previous Page 1 of 36 Next
You need to have at least 5 reputation to vote a question down. Learn How To Earn Badges.