Continuing Education Estimating Framing Materials
There is a wall with a total length of 31'6" long by 8' 6". How many sheaths of 4' x 8' pieces of 1/2" plywood are needed to cover the wall? Account for 10% waste and assume there is no space left between the plywood. Round up to the nearest full sheath.
  1. 8
  2. 9
  3. 10
  4. 11
Continuing Education Kitchen Safety and Sanitation
Identify the minimum temperature for holding hot food.
  1. 135 degrees F
  2. 140 degrees F
  3. 145 degrees F
  4. 150 degrees F
Continuing Education Estimating Framing Materials
There is an exterior wall that measures 37' 4" x 8' 2" tall. It needs to be sheathed with 2' x 8' sheaths of rigid insulation. How many sheaths do you need? Assume a 10% waste factor and round up to the nearest sheath.
  1. 18
  2. 19
  3. 20
  4. 21
Continuing Education Estimating Framing Materials
You require lumber for some header material in a wall system. The rough opening for the window is sized at 5' 6 1/8". If there are two jack studs on each side of the window how long will the header material need to be?
  1. 6 ' 9 1/8"
  2. 6' 1/8"
  3. 5' 9 1/8"
  4. 5' 1/8"
Continuing Education Estimating Framing Materials
There is an exterior wall system that has a total perimeter of 167'. Assuming there is a single bottom plate and a double top plate, what would be the required number of 2 x 4's for the walls? Add a 5% waste factor. Round up the nearest full piece.
  1. 31
  2. 11
  3. 33
  4. 18
Continuing Education Estimating Framing Materials
You are required to order 2 x 10 SPF framing lumber for the header of a window. The window requires a 2 ply header with a total length of 7' 9 1/2". What are the most efficient lengths of material to use?
  1. 2 - 16' lengths
  2. 1 -16' length
  3. 3 - 8' lengths
  4. 4 - 8' lengths
Continuing Education Power Tools
Which shop tools can be used to rip material, make miter cuts, and grooves or dados?
  1. Circular saw
  2. Chop saw
  3. Table saw
  4. Jointer
Continuing Education Problem Solving
New cabinetry is installed in a existing kitchen. The distance between the edge of the wall and the cabinet varies by 1/2" from the top to the bottom. What is the most cost effective solution to "hide" this?
  1. Reframe the entire wall system to make it level
  2. Provide a gap 1" on the large side and fill the gap in with a filler strip
  3. Remove the cabinetry and build the last cabinet at an angle
  4. Leave a gap between the cabinet and the wall
Continuing Education Problem Solving
New drywall is installed on existing studs in a building. There are numerous nail pops happening one month after the installation. What is the most common cause of this?
  1. Studs should have been removed and reinstalled new ones
  2. Wrong drywall was used
  3. Wood was wet when drywall was installed
  4. Drywall was not installed tight to the studs
Continuing Education Kitchen Safety and Sanitation
Identify the reason why foods must be labeled with a best before date or expiry date.
  1. to help people use the freshest foods first
  2. to ensure the dates are correct for selling
  3. for use before microorganisms grow to unsafe levels
  4. to stop microorganisms from growing
Continuing Education Stair Framing
A set of stairs needs to be built that has a total rise of 9' 4 1/2" . What is the best unit rise to use?
  1. 7 1/8 "
  2. 7 1/4"
  3. 7 3/8"
  4. 7 1/2"
Continuing Education Stair Framing
There is a set of stairs that has a unit rise of 7 1/2". The total rise is 10'. How many treads are there?
  1. 14
  2. 15
  3. 16
  4. 17
Continuing Education Stair Framing
You are required to build a set of straight stairs. The total rise for the stairs is 8' 4 3/4". How many risers will there be if your unit rise is 7 3/4"?
  1. 11
  2. 12
  3. 13
  4. 14
Continuing Education Hand Tools
When clamping material together, what is something that needs to be avoided to prevent damaging of material?
  1. Over clamping, which causes dents
  2. Using the wrong clamp
  3. Under clamping, which doesn't create a sufficient hold
  4. All of the above
Continuing Education Kitchen Safety and Sanitation
Identify the proper sequence for cleaning food contact surfaces.
  1. wash, rinse, sanitize
  2. wash, sanitize, dry with a clean dry cloth
  3. clean thorougly with soap and water and air dry
  4. clean surface of all dirt and debris
Continuing Education Retrofitting Solutions
You have determined that air is leaking through an electrical penetration in an exterior wall. What is the best way to rectify this?
  1. There is no way you can fix it
  2. Caulking around the gaps of the penetration
  3. Remove and reinstall the electrical work
  4. Remove the electrical work
Continuing Education Kitchen Safety and Sanitation
Identify the maximum temperature for holding cold food.
  1. 36 degrees F
  2. 41 degrees F
  3. 45 degrees F
  4. 32 degrees F
Continuing Education Gypsum and Wallboard
A piece of gypsum board can be cut slightly bigger than required and, with adequate pressure, can be forced into place.
  1. True
  2. False
Continuing Education Problem Solving
During the demolition of an existing home, after removing the plaster and wallboard, you determine the wall thickness is only a 2x4. What may need to be done to increase the insulation value of the wall system?
  1. Fur our interior of wall framing to allow for more insulation
  2. Reframe all of the walls
  3. Stuff more insulation into the cavity
  4. Nothing you can do to increase the insulation value
Continuing Education Layout and Planning of Work
When constructing a building, representatives from the city or municipality are called to the job site at different intervals throughout the project. What is the name of these representatives?
  1. Governors
  2. Inspectors
  3. Architects